Building permit drawings and approvals, handled for you

Building without a permit can put your whole investment at risk. AKAYU prepares permit-ready documentation and manages the approval process with your local assembly as part of the project.

See our work
Black line architectural plans prepared for a permit application

What we prepare

In Ghana, building permits are issued by your Metropolitan, Municipal or District Assembly, and each assembly sets its own detailed requirements. These are the documents commonly requested.

  • Architectural drawings
  • Structural drawings
  • Site plan
  • Supporting land documents, which you provide
  • Fire and environmental clearances where the project needs them

Why applications get held up

Delays usually come from incomplete documents, drawings that do not follow the zoning for the area, or land papers that are not in order. Preparing the file properly the first time is the fastest route through.

Built to the Ghana Building Code

Ghana's building code, GS 1207:2018, sets out minimum requirements for safety, health and fire protection. Our drawings are prepared with it in mind. Our permit guide explains the whole process step by step.

Frequently asked questions

How long does a building permit take?

It varies by assembly and by how complete the application is. Published estimates commonly range from about one to three months.

Can you help if I've already started building?

Contact us and speak to your assembly as soon as possible. Regularising a building depends on the assembly and what has been built.