AKAYU Construction Ltd

How to get a building permit in Ghana

A building permit in Ghana is issued by the Metropolitan, Municipal or District Assembly that covers your site. You apply with your land documents and drawings, pay the fees, and receive the permit once the assembly has reviewed and approved your application. You should have it before construction begins.

By AKAYU Construction. Last updated .

See our work
An architectural plan sheet for a house

Step by step

Details differ between assemblies, but the process generally follows the same path.

  • Confirm which assembly covers your site
  • Check the zoning and what is allowed on the plot
  • Obtain the application form from the assembly
  • Prepare your drawings and supporting documents
  • Submit the application and pay the processing fee
  • Respond to any queries from the assembly's reviewers
  • Pay the approved fee and collect your permit

Documents you are likely to need

Requirements vary, so confirm the list with your assembly. Commonly requested items are below, and several copies of drawings are often needed.

  • Completed application form
  • Evidence of land ownership, such as your indenture and site plan
  • Architectural drawings signed by a qualified professional
  • Structural drawings
  • A soil test report, where required
  • Fire and environmental clearances, depending on the project

What it costs and how long it takes

There is no single national fee. Each assembly sets its own fees through its annual fee-fixing resolution, and they typically reflect the size and use of the building. Ask the assembly for current figures rather than relying on numbers online.

Published estimates of the timeline commonly range from about one to three months, depending on the assembly and how complete your application is.

The Ghana Building Code

Ghana launched its building code, GS 1207:2018, in October 2018. It sets minimum requirements for areas such as public health, safety and fire protection, and it was developed by the Ghana Standards Authority with partners including the CSIR Building and Road Research Institute. Assemblies have a role in enforcing it.

What happens if you build without a permit

Building without a permit puts your investment at risk. Assemblies can stop the work, and unauthorised structures can be demolished. It can also make the property harder to sell or use as security later on.

Frequently asked questions

Do I need a permit to renovate my house?

Structural alterations and many renovations need one. Check with your assembly, as requirements vary.

Who can prepare my permit drawings?

Assemblies commonly ask for drawings signed by a qualified professional. AKAYU's architecture team prepares permit-ready documentation as part of our service.

Sources

This guide is general information, not legal or financial advice. Rules, fees and prices change, so confirm them with the relevant authority or a qualified professional.

Ready to start your project?

A finished AKAYU residence with a pool in front

Whether you are dreaming, planning or ready to break ground — AKAYU makes it easy to take the next step with confidence.